DAKAI
Zhejiang Dakai Special Steel Technology Co., Ltd.

Flujo sin fisuras, energía sin límites

Flujo sin fisuras,
energía sin límites

2205 · 2507 · 2520

Tubo de acero especial, laminado según su especificación

6–630 mm
Outside diameter
1–50 mm
Wall thickness
20+
Grades in production
Annual sales (RMB)
2.000 millones
Plant area (m²)
106,000
Employees
400+
Cold-rolling mills
34

Dónde va el tubo

Ocho sectores, una misma lógica de material: primero el entorno corrosivo y la temperatura, después el espesor.

  • Electric power

    01

    Supercritical boilers, nuclear steam generators, solar thermal receivers and FGD scrubbers — the four places where the grade decision is made by temperature, not price.

    Ver detalles
    Partes típicas
    Superheater / reheater, water wall, economiser, condenser U-tube, reactor internals, nuclear-grade instrument tube
    Grados habituales
    Super304H / HR3C · Inconel 690 · 317L · 2205 · Incoloy 800H
  • Natural gas & LNG

    02

    LNG moves at −196 °C and town gas at 15 MPa; the same pipe family has to hold both, which is why impact testing at cryogenic temperature is written into the contract.

    Ver detalles
    Partes típicas
    LNG transfer line, gathering line, town-gas main, indoor gas piping
    Grados habituales
    S31603 · 30408 · 316L · S32205 duplex
  • Oil refining

    03

    High-temperature hydrogen service and sour crude are two different problems; the heat-affected zone of a weld often decides the tube's life before the base metal does.

    Ver detalles
    Partes típicas
    Furnace tube, heat exchanger, hydrogenation air cooler, transfer line
    Grados habituales
    321 · 347H · 316L · 2205 · 904L
  • Chemical & fine chemical

    04

    Chlorides, acids and cyclic cleaning: the corrosion table narrows the choice to a handful of grades, and the cleaning regime usually narrows it further.

    Ver detalles
    Partes típicas
    Reactor coil, heat exchanger, process piping, sampling line
    Grados habituales
    304L · 316L · 904L · 2205 · 2507 · N06625
  • Desalination & water treatment

    05

    Seawater at 70 °C is the classic duplex application; the membrane housing and the brine line are usually where 316L stops being enough.

    Ver detalles
    Partes típicas
    Seawater intake, evaporator tube, brine line, membrane housing
    Grados habituales
    2205 · 2507 · 316L · 904L
  • Marine engineering & shipbuilding

    06

    Classification-society approvals decide whether the tube can be installed at all; the material decision comes after the paperwork decision.

    Ver detalles
    Partes típicas
    Seawater piping, hydraulic line, deck service pipe, cargo piping
    Grados habituales
    316L · 2205 · 2507 · 6Mo super-austenitic
  • Instrumentation

    07

    Small OD, tight tolerance, clean bore: instrument tube is bought on concentricity and surface, not on tonnage.

    Ver detalles
    Partes típicas
    Impulse line, sample probe, analyser tubing, 1/8"–1" OD
    Grados habituales
    316L · 304L · precision tube
  • Heat exchangers

    08

    U-bent, finned or straight: the tube-to-tubesheet joint is the failure point, and the tube's tolerance band is what makes that joint repeatable.

    Ver detalles
    Partes típicas
    U-tube, finned tube, straight tube, condenser and cooler bundles
    Grados habituales
    304/304L · 316L · 321 · 2205 · 2520

Tres plantas, una cadena

Perforación en Fujian, laminado y acabado en Pingyang, ensayos en el laboratorio de nivel CNAS.

  • Pingyang HQ — rolling and finishing

    34cold-rolling mills · 60+ major machines

    Pingyang HQ — rolling and finishing

    Cold drawing, straightening and solution annealing run from one ERP+MES centre, with the 630 mill and solution-furnace waste-heat recovery.

  • Fujian Jinhong — piercing base

    100,000t of billet a year

    Fujian Jinhong — piercing base

    630, 150 and 50 piercing mills with full-process digital control.

  • Testing centre — CNAS level

    CNASlaboratory

    Testing centre — CNAS level

    Universal testing machine, hydrostatic tester, ultrasonic and eddy-current detectors.

Live video audit

Book a 1-on-1 live HD video audit of the Pingyang production lines via Zoom, MS Teams or WhatsApp.

Reservar auditoría por video

Manufacturing

Factory-direct production and testing

Piercing runs at the Jinhong base in Fujian; rolling and finishing in Pingyang, Wenzhou; testing in our own CNAS-level laboratory. Nothing is outsourced between billet and packed tube.

  • 34 cold-rolling mills, 7 cold-drawing lines, 14 straightening lines under one ERP+MES centre
  • Every lot sampled and released before packing, EN 10204 3.1 with each shipment
  • Grades from 304 to 2507 and nickel alloys, OD 6–630 mm
  • Video audit of the production line available on request
See the full capability →
  • Pingyang headquarters plant, Wenzhou

    Pingyang headquarters plant, Wenzhou

  • Jinhong piercing base, Fujian

    Jinhong piercing base, Fujian

  • Tensile testing, in-house lab

    Tensile testing, in-house lab

  • Tube bundles before shipment

    Tube bundles before shipment

Certificaciones y cumplimiento

Cuatro certificados concentran el interés del comprador de exportación; el resto se detalla abajo.

Principales — lo primero que pide el comprador

  • PED 2014/68/EU — TÜV SÜD Certificate
  • ISO 9001:2015 — Quality Management
  • CE — EN 10216-5 (ECM, Italy)
  • ASTM A312 — Product Certification

Adicionales — sistemas y aprobaciones de producto

  • NCS Product Certification — Duplex Tube

    GB/T 21833 duplex tube product certification

  • ISO 14001:2015 — Environmental Management

    Environmental management

  • ISO 45001:2018 — Occupational Health & Safety

    Occupational health and safety

  • ISO 50001:2018 — Energy Management

    Energy management

  • Zhejiang Made Certification (ZJM)

    Regional manufacturing standard

  • Drinking-Water Product Hygiene Licence

    Potable water service

Marks on file

Credenciales corporativas: High-tech enterprise (Zhejiang) · Customs AEO advanced certified · Special equipment manufacturing licence (pressure piping) · Business licence · 24 intellectual property rights

Servicio y soporte

Una sola oficina para clientes de exportación: Shanghái gestiona la parte comercial; Pingyang se encarga de ingeniería, documentos de calidad y expedición.

24 h
first reply, business days
72 h
technical proposal
3
working languages
100%
lots with EN 10204 3.1 MTC
  1. 01

    General enquiry

    Acknowledged within one business day and routed to the responsible sales engineer.

  2. 02

    Documents and standards

    MTC, drawings or the governing standard shared within two business days.

  3. 03

    Quality claim

    Acknowledged within 24 hours; containment and a root-cause plan agreed with the customer's QA team.

  4. 04

    Improvement suggestion

    Reviewed by sales and QA together; the outcome is reported back within one week.

Pre-sales, in-sales and after-sales support is handled in English, Chinese and Spanish by the Shanghai international marketing centre, with the Pingyang technical and QA teams behind it.

Preguntas frecuentes

¿Cuál es el pedido mínimo de tubo sin soldadura?

El mínimo se fija por medida y grado para que la colada resulte rentable. Indíquenos la cantidad y la especificación objetivo y confirmamos el mínimo exacto para su medida en un día hábil. Los pedidos de prueba son negociables en la primera colaboración.

¿Suministran certificados de material EN 10204 3.1?

Sí. Cada lote se entrega con certificado de inspección EN 10204 3.1 con número de colada, grado, composición química, propiedades mecánicas y resultados de ensayo. Los certificados 3.2 con inspector externo se pueden solicitar.

¿Con qué normas pueden fabricar?

ASTM A312 / A213 / A269 / A270, GB/T 14976, GB/T 13296 y las tolerancias dimensionales de GB/T 17395-2024. Nuestros ingenieros participaron en la redacción de GB/T 17395-2024, por lo que también se pueden aplicar normas de cliente y planes de inspección acordados.

¿Cuál es el plazo de entrega del tubo 316L sin soldadura?

Las medidas estándar en stock salen en 3–7 días. La producción suele ser de 15–25 días tras el anticipo, según medida, grado y cantidad. El tubo soldado de gran diámetro y el tubo en U para intercambiadores requieren 25–35 días.

¿Pueden suministrar dúplex 2507 y tubo resistente al calor 2520?

Sí. El tubo superdúplex 2507 para líneas submarinas y el tubo 2520 resistente al calor o de aleación de níquel son dos de nuestras especialidades; también hay 2205 y 904L. Estos grados se fabrican por pedido y se cotizan según medida y cantidad.

¿Cómo se prueba el tubo antes del envío?

Prueba hidrostática, corrientes inducidas y ultrasonidos cuando se especifican, además de control dimensional, PMI, dureza y, según la norma, ensayo de aplastamiento o de corrosión intergranular. Los informes de ensayo viajan con la mercancía.

Envíe su lista de medidas o plano. Reciba una cotización en 24 horas.