Case: 3,562 t of process piping across four battery-material plants

The client is a leading domestic lithium-battery materials group with four plants: Changsha, Fuding, Ningde and Yichang.

ItemDetail
Volume3,562 t
DeliveryReleased in batches, shipped to four plants separately
DocumentsEN 10204 3.1 plus third-party inspection per batch

What battery materials ask of tube is not peak strength but consistency: the same grades and sizes feed all four plants, so any batch drifting out of band shows up at installation.

Spectrometer, mechanical and dimensional records are filed per plant, so goods can be booked in on arrival without re-checking.

Client names are withheld at their request. Project details and certificates are shared during a quotation.