
2026-11-17
Case: 3,562 t of process piping across four battery-material plants
Four plants, multiple release batches, and a document pack that has to match each one.

2026-11-13
Case: 310S, 2205 and 2507 seamless tube for Hebei Chengxin's fine chemical lines
310S, 2205 and 2507 seamless tube, OD 10–630 mm and WT 1–10 mm, to GB/T 14976-2025 and GB/T 21833.2-2020, for Hebei Chengxin's corrosive media, reactor and recovery lines.

2026-11-10
Case: 852 t of heat-exchanger and process tube for a PV silicon base
Tight OD and wall tolerances for automated welding lines were the hard part of this order.

2026-11-05
Case: 145.8 t of BA-grade clean tube for an electronics campus
BA grade is not only about a bright surface; the packing has to keep it that way.

2026-10-16
TP321 and 904L Stainless Steel Pipe for 800°C Fluoride Service in a Chemical Plant
A provincial chemical group's plasma pyrolysis project for fluorine-containing specialty gases runs its transfer system at 800°C in acidic, fluoride-bearing media. Dakai supplied TP321 and 904L pipe, layer-matched to duty, with eddy current and ultrasonic testing.

2026-08-21
Nuclear-Grade Stainless Seamless Tube: Class 2 and Class 3 Supply for a Nuclear Power Project
In March 2025 a large domestic nuclear power project added Dakai to its supply chain: Class 2 and Class 3 nuclear-safety seamless stainless tube in 304L, 316L and TP321.

2026-07-24
Case: 316L, 2205 and super duplex 2507 tube for offshore platform process piping
High-pressure process piping and exchanger tubes in chloride and H2S service: 316L, 2205 and super duplex 2507 chosen per location, PREN from about 24 to ≥42, exchanger OD held to ±0.10 mm.

2026-06-05
Case: 316L seamless and duplex tube for CORNEX lithium-battery plants
Ultrapure water, high-purity nitrogen and electrolyte share one piping system; cleanliness, corrosion resistance and delivery pace are the constraints.

2026-05-21
Nuclear Seamless Pipe Localization: 42% Lower Cost, 70% Shorter Lead Time at Lianjiang
For Lianjiang's six CAP units Dakai supplied 316L/321/310S/2205/2507 seamless pipe: 42% lower purchased cost, 70% shorter lead time, ≥99.8% NDT pass rate.
